Oficiālais kopsavilkums · English
Kas tiek iepirkts?
RTE, the French electricity transmission system operator, is responsible for the development, implementation and operation of the connection of offshore wind farms to the French public power transmission system. In this context, RTE intends to carry out Geophysical surveys for its future Offshore Substations and Submarine Cables (excluding Landfall). The purpose of this Contract notice is to introduce the 3 potential waves of call for tenders covering some Geophysical survey needs in the coming years and in particular from 2025 to 2026. Estimated number of projects from 2025 to 2026: 4 projects. RTE reserves the right to cancel or add a project.
Informatīvs mašīntulkojums. Oficiālais kopsavilkums joprojām ir noteicošais.
Oficiālais kopsavilkums · English
RTE, the French electricity transmission system operator, is responsible for the development, implementation and operation of the connection of offshore wind farms to the French public power transmission system. In this context, RTE intends to carry out Geophysical surveys for its future Offshore Substations and Submarine Cables (excluding Landfall). The purpose of this Contract notice is to introduce the 3 potential waves of call for tenders covering some Geophysical survey needs in the coming years and in particular from 2025 to 2026. Estimated number of projects from 2025 to 2026: 4 projects. RTE reserves the right to cancel or add a project.
Paziņojuma vēsture
Iepirkuma procedūras laika skala
Sekojiet galvenajiem posmiem un atjauninājumiem, kas saistīti ar šo iepirkuma procedūru.
Cits saistīts paziņojums vēl nav identificēts.
Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.
Avots un uzticamība
TED · 448163-2026. Pārbaudīts 2026. gada 23. aug. 10:05.