Rezumat oficial · English
Ce se achiziționează?
RTE, the French electricity transmission system operator, is responsible for the development, implementation and operation of the connection of offshore wind farms to the French public power transmission system. In this context, RTE intends to carry out Geophysical surveys for its future Offshore Substations and Submarine Cables (excluding Landfall). The purpose of this Contract notice is to introduce the 3 potential waves of call for tenders covering some Geophysical survey needs in the coming years and in particular from 2025 to 2026. Estimated number of projects from 2025 to 2026: 4 projects. RTE reserves the right to cancel or add a project.
Traducere automată orientativă. Rezumatul oficial rămâne referința.
Rezumat oficial · English
RTE, the French electricity transmission system operator, is responsible for the development, implementation and operation of the connection of offshore wind farms to the French public power transmission system. In this context, RTE intends to carry out Geophysical surveys for its future Offshore Substations and Submarine Cables (excluding Landfall). The purpose of this Contract notice is to introduce the 3 potential waves of call for tenders covering some Geophysical survey needs in the coming years and in particular from 2025 to 2026. Estimated number of projects from 2025 to 2026: 4 projects. RTE reserves the right to cancel or add a project.
Istoricul anunțului
Cronologia procedurii de achiziție
Urmăriți principalele etape și actualizări legate de această procedură de achiziție.
Nu a fost identificat încă niciun alt anunț asociat.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.
Sursă și fiabilitate
TED · 448163-2026. Verificat la 23 aug. 2026, 10:05.