Što se nabavlja?
RTE, the French electricity transmission system operator, is responsible for the development, implementation and operation of the connection of offshore wind farms to the French public power transmission system. In this context, RTE intends to carry out Geophysical surveys for its future Offshore Substations and Submarine Cables (excluding Landfall). The purpose of this Contract notice is to introduce the 3 potential waves of call for tenders covering some Geophysical survey needs in the coming years and in particular from 2025 to 2026. Estimated number of projects from 2025 to 2026: 4 projects. RTE reserves the right to cancel or add a project.
Strojni prijevod za lakše razumijevanje. Službeni sažetak ostaje mjerodavan.
Službeni sažetak · English
RTE, the French electricity transmission system operator, is responsible for the development, implementation and operation of the connection of offshore wind farms to the French public power transmission system. In this context, RTE intends to carry out Geophysical surveys for its future Offshore Substations and Submarine Cables (excluding Landfall). The purpose of this Contract notice is to introduce the 3 potential waves of call for tenders covering some Geophysical survey needs in the coming years and in particular from 2025 to 2026. Estimated number of projects from 2025 to 2026: 4 projects. RTE reserves the right to cancel or add a project.
Povijest obavijesti
Vremenski slijed postupka nabave
Pratite glavne faze i izmjene povezane s ovim postupkom nabave.
Još nije pronađena nijedna druga povezana obavijest.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.
Izvor i pouzdanost
TED · 448163-2026. Provjereno 23. kol 2026. 10:05.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.