Official summary
What is being procured?
The conversion of part of the former PJ Carroll's factory (Phase One) , a protected structure and the associated former boiler house building (Phase Two)into 3487 sqm of apprenticeship teaching facilities. The Works to the main factory building consist of modifying the interior, stripping out internal walls and the construction of new motor vehicle workshops, electrical workshops, classrooms and other ancillary spaces, new rollar shutters, façade works and a new mezzanine office space. The works to the former boiler house include 1. The demolition of a small service building behind the boiler house 2. Replacement of the roof with a new membrane system 3. New fall restraint and arrest systems, access 4. Removal of three obsolete boiler flues from the south elevation of the 5.…
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 428931-2026. Checked on Aug 23, 2026, 6:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.