The conversion of part of the former PJ Carroll's factory (Phase One) , a protected structure and the associated former boiler house building (Phase Two)into 3487 sqm of apprenticeship teaching facilities. The Works to the main factory building consist of modifying the interior, stripping out internal walls and the construction of new motor vehicle workshops, electrical workshops, classrooms and other ancillary spaces, new rollar shutters, façade works and a new mezzanine office space. The works to the former boiler house include 1. The demolition of a small service building behind the boiler house 2. Replacement of the roof with a new membrane system 3. New fall restraint and arrest systems, access 4. Removal of three obsolete boiler flues from the south elevation of the 5.…
Machinevertaling ter ondersteuning. De officiële samenvatting blijft leidend.
Officiële samenvatting · English
The conversion of part of the former PJ Carroll's factory (Phase One) , a protected structure and the associated former boiler house building (Phase Two)into 3487 sqm of apprenticeship teaching facilities. The Works to the main factory building consist of modifying the interior, stripping out internal walls and the construction of new motor vehicle workshops, electrical workshops, classrooms and other ancillary spaces, new rollar shutters, façade works and a new mezzanine office space. The works to the former boiler house include 1. The demolition of a small service building behind the boiler house 2. Replacement of the roof with a new membrane system 3. New fall restraint and arrest systems, access 4. Removal of three obsolete boiler flues from the south elevation of the 5.…
Historie van de aankondiging
Tijdlijn van de aanbestedingsprocedure
Volg de belangrijkste fasen en updates van deze aanbestedingsprocedure.
Er is nog geen andere gerelateerde aankondiging gevonden.
De gegevens zijn voor een betere leesbaarheid geordend. De officiële aankondiging en aanbestedingsstukken zijn altijd doorslaggevend.
Bron en betrouwbaarheid
TED · 428931-2026. Gecontroleerd op 23 aug. 2026 06:05.
De gegevens zijn voor een betere leesbaarheid geordend. De officiële aankondiging en aanbestedingsstukken zijn altijd doorslaggevend.