Résumé officiel · English
Quel est l’objet du marché ?
The conversion of part of the former PJ Carroll's factory (Phase One) , a protected structure and the associated former boiler house building (Phase Two)into 3487 sqm of apprenticeship teaching facilities. The Works to the main factory building consist of modifying the interior, stripping out internal walls and the construction of new motor vehicle workshops, electrical workshops, classrooms and other ancillary spaces, new rollar shutters, façade works and a new mezzanine office space. The works to the former boiler house include 1. The demolition of a small service building behind the boiler house 2. Replacement of the roof with a new membrane system 3. New fall restraint and arrest systems, access 4. Removal of three obsolete boiler flues from the south elevation of the 5.…
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
The conversion of part of the former PJ Carroll's factory (Phase One) , a protected structure and the associated former boiler house building (Phase Two)into 3487 sqm of apprenticeship teaching facilities. The Works to the main factory building consist of modifying the interior, stripping out internal walls and the construction of new motor vehicle workshops, electrical workshops, classrooms and other ancillary spaces, new rollar shutters, façade works and a new mezzanine office space. The works to the former boiler house include 1. The demolition of a small service building behind the boiler house 2. Replacement of the roof with a new membrane system 3. New fall restraint and arrest systems, access 4. Removal of three obsolete boiler flues from the south elevation of the 5.…
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 428931-2026. Vérifié le 23 août 2026 à 06:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.