Sintesi ufficiale · English
Che cosa viene acquistato?
The conversion of part of the former PJ Carroll's factory (Phase One) , a protected structure and the associated former boiler house building (Phase Two)into 3487 sqm of apprenticeship teaching facilities. The Works to the main factory building consist of modifying the interior, stripping out internal walls and the construction of new motor vehicle workshops, electrical workshops, classrooms and other ancillary spaces, new rollar shutters, façade works and a new mezzanine office space. The works to the former boiler house include 1. The demolition of a small service building behind the boiler house 2. Replacement of the roof with a new membrane system 3. New fall restraint and arrest systems, access 4. Removal of three obsolete boiler flues from the south elevation of the 5.…
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
The conversion of part of the former PJ Carroll's factory (Phase One) , a protected structure and the associated former boiler house building (Phase Two)into 3487 sqm of apprenticeship teaching facilities. The Works to the main factory building consist of modifying the interior, stripping out internal walls and the construction of new motor vehicle workshops, electrical workshops, classrooms and other ancillary spaces, new rollar shutters, façade works and a new mezzanine office space. The works to the former boiler house include 1. The demolition of a small service building behind the boiler house 2. Replacement of the roof with a new membrane system 3. New fall restraint and arrest systems, access 4. Removal of three obsolete boiler flues from the south elevation of the 5.…
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 428931-2026. Verificato il 23 ago 2026, 06:05.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.