Odprto Vir · Jezik: English

Srbija · Gradbena dela

Uradni predmet · English

Works contracts – Section 3 Paraćin – Trupale – Medjurovo (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project

Serbian Railway Infrastructure JSC · Srbija

Rok 2. okt. 2026 10:00 UTC
Ocenjena vrednostNi navedeno
Objavljeno4. avg. 2026
Odpri uradno obvestilo ↗

Uradni povzetek · English

Kaj je predmet naročila?

The Works Contract covers Section 3 of the Belgrade–Niš Modernisation Project, which is divided into four subsections, (subsection 3.2 Stalać – Đunis is already contracted). The works relate to Subsections 3.1 Paraćin–Stalać, 3.3 Đunis–Trupale and 3.4 Trupale–Medjurovo. Subsection Paraćin–Stalać is 20.8 km long, while Subsection Đunis–Trupale is 37.7 km long and Subsection Trupale – Medjurovo is 6.7 km long. A total of ten stations will be reconstructed and modernised to meet the demands of both passenger and freight traffic. The design speed is 200 km/h for Subsection 3.1 and 200 km/h for Subsection 3.3. On the Subsection Trupale–Medjurovo the works include reconstruction of the existing railway line with construction of passenger platforms and underpass at station Nis Ranzirna. Across al

Vir in zanesljivost

Vir: uradno obvestilo TED 538901-2026, nazadnje preverjeno 21. avg. 2026 20:05. Odločilna ostaja izvirna objava.

Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.