Sérvia · Obras de construção

Objeto oficial · English

Works contracts – Section 3 Paraćin – Trupale – Medjurovo (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project

Serbian Railway Infrastructure JSC · Sérvia

Prazo 2 de out de 2026 10:00 UTC
Valor estimadoNão indicado
Publicado4 de ago de 2026
Abrir o anúncio oficial ↗

Resumo oficial · English

O que está a ser adquirido?

The Works Contract covers Section 3 of the Belgrade–Niš Modernisation Project, which is divided into four subsections, (subsection 3.2 Stalać – Đunis is already contracted). The works relate to Subsections 3.1 Paraćin–Stalać, 3.3 Đunis–Trupale and 3.4 Trupale–Medjurovo. Subsection Paraćin–Stalać is 20.8 km long, while Subsection Đunis–Trupale is 37.7 km long and Subsection Trupale – Medjurovo is 6.7 km long. A total of ten stations will be reconstructed and modernised to meet the demands of both passenger and freight traffic. The design speed is 200 km/h for Subsection 3.1 and 200 km/h for Subsection 3.3. On the Subsection Trupale–Medjurovo the works include reconstruction of the existing railway line with construction of passenger platforms and underpass at station Nis Ranzirna. Across al

Fonte e fiabilidade

Fonte: anúncio oficial do TED 538901-2026, verificado pela última vez em 21 de ago de 2026 20:05. A publicação original continua a ser a referência.

Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.