Oficiali santrauka · English
Kas perkama?
The Works Contract covers Section 3 of the Belgrade–Niš Modernisation Project, which is divided into four subsections, (subsection 3.2 Stalać – Đunis is already contracted). The works relate to Subsections 3.1 Paraćin–Stalać, 3.3 Đunis–Trupale and 3.4 Trupale–Medjurovo. Subsection Paraćin–Stalać is 20.8 km long, while Subsection Đunis–Trupale is 37.7 km long and Subsection Trupale – Medjurovo is 6.7 km long. A total of ten stations will be reconstructed and modernised to meet the demands of both passenger and freight traffic. The design speed is 200 km/h for Subsection 3.1 and 200 km/h for Subsection 3.3. On the Subsection Trupale–Medjurovo the works include reconstruction of the existing railway line with construction of passenger platforms and underpass at station Nis Ranzirna. Across al
Šaltinis ir patikimumas
Šaltinis: oficialus TED skelbimas 538901-2026, paskutinį kartą tikrinta 2026-08-21 20:05. Pirminė publikacija išlieka lemiama.
Duomenys pertvarkyti, kad būtų lengviau skaityti. Oficialus skelbimas ir pirkimo dokumentai visada turi pirmenybę.