Võimaluse kokkuvõte
Mida hangitakse?
The Works Contract covers Section 3 of the Belgrade–Niš Modernisation Project, which is divided into four subsections, (subsection 3.2 Stalać – Đunis is already contracted). The works relate to Subsections 3.1 Paraćin–Stalać, 3.3 Đunis–Trupale and 3.4 Trupale–Medjurovo. Subsection Paraćin–Stalać is 20.8 km long, while Subsection Đunis–Trupale is 37.7 km long and Subsection Trupale – Medjurovo is 6.7 km long. A total of ten stations will be reconstructed and modernised to meet the demands of both passenger and freight traffic. The design speed is 200 km/h for Subsection 3.1 and 200 km/h for Subsection 3.3. On the Subsection Trupale–Medjurovo the works include reconstruction of the existing railway line with construction of passenger platforms and underpass at station Nis Ranzirna. Across al
Allikas ja usaldusväärsus
Allikas: ametlik TEDi teade 538901-2026, viimati kontrollitud 21. aug 2026 20:05. Määravaks jääb algne väljaanne.
Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.