Works contracts – Section 3 Paraćin – Trupale – Medjurovo (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project

Serbian Railway Infrastructure JSC · an tSeirbia

Spriocdháta 2 DFómh 2026 10:00 UTC
Luach meastaGan fógairt
Foilsithe4 Lún 2026
Oscail an fógra oifigiúil ↗

Achoimre oifigiúil · English

Cad atá á sholáthar?

The Works Contract covers Section 3 of the Belgrade–Niš Modernisation Project, which is divided into four subsections, (subsection 3.2 Stalać – Đunis is already contracted). The works relate to Subsections 3.1 Paraćin–Stalać, 3.3 Đunis–Trupale and 3.4 Trupale–Medjurovo. Subsection Paraćin–Stalać is 20.8 km long, while Subsection Đunis–Trupale is 37.7 km long and Subsection Trupale – Medjurovo is 6.7 km long. A total of ten stations will be reconstructed and modernised to meet the demands of both passenger and freight traffic. The design speed is 200 km/h for Subsection 3.1 and 200 km/h for Subsection 3.3. On the Subsection Trupale–Medjurovo the works include reconstruction of the existing railway line with construction of passenger platforms and underpass at station Nis Ranzirna. Across al

Foinse agus iontaofacht

Foinse: fógra oifigiúil TED 538901-2026, seiceáilte go deireanach an 21 Lún 2026 20:05. Is í an bhunfhoilseachán an fhoinse údarásach.

Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.