Works contracts – Section 3 Paraćin – Trupale – Medjurovo (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project

Serbian Railway Infrastructure JSC · Serbija

Termiņš 2026. gada 2. okt. 10:00 UTC
Paredzamā vērtībaNav paziņots
Publicēts2026. gada 4. aug.
Atvērt oficiālo paziņojumu ↗

Oficiālais kopsavilkums · English

Kas tiek iepirkts?

The Works Contract covers Section 3 of the Belgrade–Niš Modernisation Project, which is divided into four subsections, (subsection 3.2 Stalać – Đunis is already contracted). The works relate to Subsections 3.1 Paraćin–Stalać, 3.3 Đunis–Trupale and 3.4 Trupale–Medjurovo. Subsection Paraćin–Stalać is 20.8 km long, while Subsection Đunis–Trupale is 37.7 km long and Subsection Trupale – Medjurovo is 6.7 km long. A total of ten stations will be reconstructed and modernised to meet the demands of both passenger and freight traffic. The design speed is 200 km/h for Subsection 3.1 and 200 km/h for Subsection 3.3. On the Subsection Trupale–Medjurovo the works include reconstruction of the existing railway line with construction of passenger platforms and underpass at station Nis Ranzirna. Across al

Avots un uzticamība

Avots: oficiālais TED paziņojums 538901-2026, pēdējā pārbaude 2026. gada 21. aug. 20:05. Noteicošā ir sākotnējā publikācija.

Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.