Uzatvorené TED · Zdroj · Jazyk: English

Nórsko · Stavebné konštrukcie, materiály a pomocné výrobky

Oficiálny názov · English

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station (V2).

Gjøvik Kommune · Nórsko

Zobraziť oznámenia pod týmto názvom
Lehota 21. 8. 2026 11:00 UTC
Predpokladaná hodnota95 000 000 NOK
Zverejnené10. 7. 2026
Otvoriť oficiálne oznámenie ↗

Oficiálne zhrnutie · English

Čo je predmetom obstarávania?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be es

História oznámení

Časová os verejného obstarávania

Sledujte hlavné etapy a aktualizácie súvisiace s týmto postupom verejného obstarávania.

Zatiaľ sa nenašlo žiadne ďalšie súvisiace oznámenie.

  1. Oznámenie o verejnom obstarávaní Aktuálne oznámenie

    · TED 476816-2026

    Otvoriť oficiálne oznámenie ↗

Údaje sú upravené na ľahšie čítanie. Oficiálne oznámenie a súťažné podklady majú vždy prednosť.

Zdroj a spoľahlivosť

TED · 476816-2026. Overené 23. 8. 2026, 15:05.

Údaje sú upravené na ľahšie čítanie. Oficiálne oznámenie a súťažné podklady majú vždy prednosť.

Nahlásiť chybu e-mailom