Zatvoreno TED · Izvor · Jezik: English

Norveška · Građevinske konstrukcije, materijali i pomoćni proizvodi

Službeni naslov · English

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station (V2).

Gjøvik Kommune · Norveška

Pogledajte objave pod ovim nazivom
Rok 21. kol 2026. 11:00 UTC
Procijenjena vrijednost95 000 000 NOK
Objavljeno10. srp 2026.
Otvorite službenu obavijest ↗

Službeni sažetak · English

Što se nabavlja?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be es

Povijest obavijesti

Vremenski slijed postupka nabave

Pratite glavne faze i izmjene povezane s ovim postupkom nabave.

Još nije pronađena nijedna druga povezana obavijest.

  1. Obavijest o nadmetanju Trenutačna obavijest

    · TED 476816-2026

    Otvorite službenu obavijest ↗

Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.

Izvor i pouzdanost

TED · 476816-2026. Provjereno 23. kol 2026. 15:05.

Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.

Prijavite pogrešku e-poštom