Suljettu TED · Lähde · Kieli: English

Norja · Rakennusrakenteet, materiaalit ja aputuotteet

Virallinen otsikko · English

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station (V2).

Gjøvik Kommune · Norja

Näytä tällä nimellä julkaistut ilmoitukset
Määräaika 21.8.2026 11:00 UTC
Arvioitu arvo95 000 000 NOK
Julkaistu10.7.2026
Avaa virallinen ilmoitus ↗

Virallinen yhteenveto · English

Mitä hankitaan?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be es

Ilmoitushistoria

Hankintamenettelyn aikajana

Seuraa tähän hankintamenettelyyn liittyviä päävaiheita ja päivityksiä.

Muita tähän liittyviä ilmoituksia ei ole vielä tunnistettu.

  1. Hankintailmoitus Nykyinen ilmoitus

    · TED 476816-2026

    Avaa virallinen ilmoitus ↗

Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.

Lähde ja luotettavuus

TED · 476816-2026. Tarkistettu 23.8.2026 klo 15.05.

Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.

Ilmoita virheestä sähköpostitse