Encerrado TED · Fonte · Idioma: English

Noruega · Estruturas, materiais e produtos auxiliares de construção

Título oficial · English

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station (V2).

Gjøvik Kommune · Noruega

Ver anúncios com este nome
Prazo 21 de ago de 2026 11:00 UTC
Valor estimado95 000 000 NOK
Publicado10 de jul de 2026
Abrir o anúncio oficial ↗

Resumo oficial · English

O que está a ser adquirido?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be es

Histórico do anúncio

Cronologia do procedimento de contratação pública

Acompanhe as principais etapas e atualizações associadas a este procedimento de contratação pública.

Ainda não foi identificado nenhum outro anúncio relacionado.

  1. Anúncio de concurso Anúncio atual

    · TED 476816-2026

    Abrir o anúncio oficial ↗

Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.

Fonte e fiabilidade

TED · 476816-2026. Verificado em 23 de ago de 2026 15:05.

Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.

Comunicar um erro por e-mail