BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station (V2).

Gjøvik Kommune · Norvegia

Vezi anunțurile sub acest nume
Termen-limită 21 aug. 2026 11:00 UTC
Valoare estimată95.000.000 NOK
Publicat10 iul. 2026
Deschideți anunțul oficial ↗

Rezumat oficial · English

Ce se achiziționează?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be es

Istoricul anunțului

Cronologia procedurii de achiziție

Urmăriți principalele etape și actualizări legate de această procedură de achiziție.

Nu a fost identificat încă niciun alt anunț asociat.

  1. Anunț de participare Anunțul curent

    · TED 476816-2026

    Deschideți anunțul oficial ↗

Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.

Sursă și fiabilitate

TED · 476816-2026. Verificat la 23 aug. 2026, 15:05.

Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.

Semnalați o eroare prin e-mail