Adjudicado TED · Fuente · Idioma: English

Irlanda · Trabajos de construcción

Título oficial · English

EST Constr - Letterkenny University Hospital, Co. Donegal. Boiler House Upgrade

Health Service Executive (HSE) · Irlanda

Ver anuncios con este nombre
Plazo No indicado
Valor estimado4.434.405 EUR
Publicado1 sept. 2026
Abrir el anuncio oficial ↗

Resumen oficial · English

¿Qué se contrata?

The project includes the Replacement of existing MTHW Boilers with 3 No. dual fuel MTHW Boilers. The contractor will be responsible for the installation of associated boiler plant including pressurisation equipment, Heat exchangers, circulating pumps, valves, pipework and insulation. A free standing flue installed adjacent the Boiler house will be adjusted for the new Boiler plant. The boiler house will be extensively renovated to accommodate the proposed new boiler plant and equipment. Builders works is required including construction and fitting out of the renovated boiler house, roof alterations to accommodate a new roof light and works associated with a Lpg tank compound. Electrical Works include replacement cabling, local isolators for boiler plant, emergency lighting and fire alarm w

Historial del anuncio

Cronología del procedimiento de contratación

Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.

Todavía no se ha identificado ningún otro anuncio relacionado.

  1. Anuncio de adjudicación Anuncio actual

    · TED 600441-2026

    Abrir el anuncio oficial ↗

Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.

Fuente y fiabilidad

TED · 600441-2026. Verificado el 4 sept. 2026 6:05.

Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.

Informar de un error por correo electrónico