Vad upphandlas?
The project includes the Replacement of existing MTHW Boilers with 3 No. dual fuel MTHW Boilers. The contractor will be responsible for the installation of associated boiler plant including pressurisation equipment, Heat exchangers, circulating pumps, valves, pipework and insulation. A free standing flue installed adjacent the Boiler house will be adjusted for the new Boiler plant. The boiler house will be extensively renovated to accommodate the proposed new boiler plant and equipment. Builders works is required including construction and fitting out of the renovated boiler house, roof alterations to accommodate a new roof light and works associated with a Lpg tank compound. Electrical Works include replacement cabling, local isolators for boiler plant, emergency lighting and fire alarm w
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
The project includes the Replacement of existing MTHW Boilers with 3 No. dual fuel MTHW Boilers. The contractor will be responsible for the installation of associated boiler plant including pressurisation equipment, Heat exchangers, circulating pumps, valves, pipework and insulation. A free standing flue installed adjacent the Boiler house will be adjusted for the new Boiler plant. The boiler house will be extensively renovated to accommodate the proposed new boiler plant and equipment. Builders works is required including construction and fitting out of the renovated boiler house, roof alterations to accommodate a new roof light and works associated with a Lpg tank compound. Electrical Works include replacement cabling, local isolators for boiler plant, emergency lighting and fire alarm w
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Inget annat relaterat meddelande har ännu identifierats.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 600441-2026. Kontrollerad 4 sep. 2026 06:05.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.