EST Constr - Letterkenny University Hospital, Co. Donegal. Boiler House Upgrade

Health Service Executive (HSE) · Irlande

Voir les avis sous ce nom
Échéance Non communiqué
Valeur estimée4 434 405 EUR
Publié1 sept. 2026
Ouvrir l’avis officiel ↗

Résumé officiel · English

Quel est l’objet du marché ?

The project includes the Replacement of existing MTHW Boilers with 3 No. dual fuel MTHW Boilers. The contractor will be responsible for the installation of associated boiler plant including pressurisation equipment, Heat exchangers, circulating pumps, valves, pipework and insulation. A free standing flue installed adjacent the Boiler house will be adjusted for the new Boiler plant. The boiler house will be extensively renovated to accommodate the proposed new boiler plant and equipment. Builders works is required including construction and fitting out of the renovated boiler house, roof alterations to accommodate a new roof light and works associated with a Lpg tank compound. Electrical Works include replacement cabling, local isolators for boiler plant, emergency lighting and fire alarm w

Historique de l’avis

Chronologie de la procédure

Suivez les principales étapes et mises à jour liées à cette procédure de passation.

Aucun autre avis lié n’a encore été identifié.

  1. Avis d’attribution Avis actuel

    · TED 600441-2026

    Ouvrir l’avis officiel ↗

Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.

Source et fiabilité

TED · 600441-2026. Vérifié le 4 sept. 2026 à 06:05.

Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.

Signaler une erreur par e-mail