Resumen oficial · English
¿Qué se contrata?
The project includes for the disconnection, removal and replacement of the 3 No Airconditioning AHU units on the roof plant area of the building, including the associated ductwork, attenuators, fittings, weathered upstands etc. The scope also includes modifications and additions to the existing ductwork installation on the ground floor to serve additional modular offices hat were originally part of an open plan arrangement.
Fuente y fiabilidad
Fuente: anuncio oficial de TED 555358-2026, comprobado por última vez el 21 ago. 2026 20:07. La publicación original sigue siendo la referencia.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.