Sommarju uffiċjali · English
X’qed jiġi akkwistat?
The project includes for the disconnection, removal and replacement of the 3 No Airconditioning AHU units on the roof plant area of the building, including the associated ductwork, attenuators, fittings, weathered upstands etc. The scope also includes modifications and additions to the existing ductwork installation on the ground floor to serve additional modular offices hat were originally part of an open plan arrangement.
Sors u affidabbiltà
Sors: avviż uffiċjali tat-TED 555358-2026, iċċekkjat l-aħħar fil-21 Aww 2026 20:07. Il-pubblikazzjoni oriġinali tibqa’ awtorevoli.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.