Официално резюме · English
Какво се възлага?
The project includes for the disconnection, removal and replacement of the 3 No Airconditioning AHU units on the roof plant area of the building, including the associated ductwork, attenuators, fittings, weathered upstands etc. The scope also includes modifications and additions to the existing ductwork installation on the ground floor to serve additional modular offices hat were originally part of an open plan arrangement.
Източник и надеждност
Източник: официално обявление в TED 555358-2026, последно проверено на 21.08.2026 г., 20:07 ч.. Оригиналната публикация остава меродавна.
Данните са преструктурирани за по-лесно четене. Официалното обявление и документите винаги имат предимство.