Oficiali santrauka · English
Kas perkama?
The project includes for the disconnection, removal and replacement of the 3 No Airconditioning AHU units on the roof plant area of the building, including the associated ductwork, attenuators, fittings, weathered upstands etc. The scope also includes modifications and additions to the existing ductwork installation on the ground floor to serve additional modular offices hat were originally part of an open plan arrangement.
Šaltinis ir patikimumas
Šaltinis: oficialus TED skelbimas 555358-2026, paskutinį kartą tikrinta 2026-08-21 20:07. Pirminė publikacija išlieka lemiama.
Duomenys pertvarkyti, kad būtų lengviau skaityti. Oficialus skelbimas ir pirkimo dokumentai visada turi pirmenybę.