Službeni sažetak · English
Što se nabavlja?
The project includes for the disconnection, removal and replacement of the 3 No Airconditioning AHU units on the roof plant area of the building, including the associated ductwork, attenuators, fittings, weathered upstands etc. The scope also includes modifications and additions to the existing ductwork installation on the ground floor to serve additional modular offices hat were originally part of an open plan arrangement.
Izvor i pouzdanost
Izvor: službena TED obavijest 555358-2026, zadnji put provjerena 21. kol 2026. 20:07. Izvorna objava ostaje mjerodavna.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.