Resumen oficial · English
¿Qué se contrata?
EirGrid intends to enter into an agreement with Greenlink Interconnector (“Greenlink”) for the provision of Black Start services. This agreement aims to enhance system resilience and ensure rapid restoration capabilities in the event of a major outage. It is structured to address the technical requirements and operational needs specific to Black Start scenarios. This agreement is for 3 years from 23 February 2026 - 23 February 2029 with an option to extend for 2 additional years (5 years in total) value is €680K per year - €3,400,000 total over the potential 5 years
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
EirGrid intends to enter into an agreement with Greenlink Interconnector (“Greenlink”) for the provision of Black Start services. This agreement aims to enhance system resilience and ensure rapid restoration capabilities in the event of a major outage. It is structured to address the technical requirements and operational needs specific to Black Start scenarios. This agreement is for 3 years from 23 February 2026 - 23 February 2029 with an option to extend for 2 additional years (5 years in total) value is €680K per year - €3,400,000 total over the potential 5 years
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 475664-2026. Verificado el 23 ago. 2026 15:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.