Quel est l’objet du marché ?
EirGrid intends to enter into an agreement with Greenlink Interconnector (“Greenlink”) for the provision of Black Start services. This agreement aims to enhance system resilience and ensure rapid restoration capabilities in the event of a major outage. It is structured to address the technical requirements and operational needs specific to Black Start scenarios. This agreement is for 3 years from 23 February 2026 - 23 February 2029 with an option to extend for 2 additional years (5 years in total) value is €680K per year - €3,400,000 total over the potential 5 years
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
EirGrid intends to enter into an agreement with Greenlink Interconnector (“Greenlink”) for the provision of Black Start services. This agreement aims to enhance system resilience and ensure rapid restoration capabilities in the event of a major outage. It is structured to address the technical requirements and operational needs specific to Black Start scenarios. This agreement is for 3 years from 23 February 2026 - 23 February 2029 with an option to extend for 2 additional years (5 years in total) value is €680K per year - €3,400,000 total over the potential 5 years
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 475664-2026. Vérifié le 23 août 2026 à 15:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.