EirGrid intends to enter into an agreement with Greenlink Interconnector (“Greenlink”) for the provision of Black Start services. This agreement aims to enhance system resilience and ensure rapid restoration capabilities in the event of a major outage. It is structured to address the technical requirements and operational needs specific to Black Start scenarios. This agreement is for 3 years from 23 February 2026 - 23 February 2029 with an option to extend for 2 additional years (5 years in total) value is €680K per year - €3,400,000 total over the potential 5 years
Meaisínaistriúchán mar threoir. Is í an achoimre oifigiúil an tagairt údarásach.
Achoimre oifigiúil · English
EirGrid intends to enter into an agreement with Greenlink Interconnector (“Greenlink”) for the provision of Black Start services. This agreement aims to enhance system resilience and ensure rapid restoration capabilities in the event of a major outage. It is structured to address the technical requirements and operational needs specific to Black Start scenarios. This agreement is for 3 years from 23 February 2026 - 23 February 2029 with an option to extend for 2 additional years (5 years in total) value is €680K per year - €3,400,000 total over the potential 5 years
Stair na bhfógraí
Amlíne an tsoláthair
Lean na príomhchéimeanna agus na nuashonruithe a bhaineann leis an nós imeachta soláthair seo.
Níor sainaithníodh aon fhógra gaolmhar eile go fóill.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.
Foinse agus iontaofacht
TED · 475664-2026. Seiceáilte ar 23 Lún 2026 15:05.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.