Sommarju uffiċjali · English
X’qed jiġi akkwistat?
EirGrid intends to enter into an agreement with Greenlink Interconnector (“Greenlink”) for the provision of Black Start services. This agreement aims to enhance system resilience and ensure rapid restoration capabilities in the event of a major outage. It is structured to address the technical requirements and operational needs specific to Black Start scenarios. This agreement is for 3 years from 23 February 2026 - 23 February 2029 with an option to extend for 2 additional years (5 years in total) value is €680K per year - €3,400,000 total over the potential 5 years
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · English
EirGrid intends to enter into an agreement with Greenlink Interconnector (“Greenlink”) for the provision of Black Start services. This agreement aims to enhance system resilience and ensure rapid restoration capabilities in the event of a major outage. It is structured to address the technical requirements and operational needs specific to Black Start scenarios. This agreement is for 3 years from 23 February 2026 - 23 February 2029 with an option to extend for 2 additional years (5 years in total) value is €680K per year - €3,400,000 total over the potential 5 years
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
S’issa ma ġie identifikat l-ebda avviż ieħor relatat.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 475664-2026. Iċċekkjat fil-23 Aww 2026 15:05.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.