Amtliche Zusammenfassung · English
Was wird beschafft?
The Buoy Crane on the NLV Pharos vessel is in need of its 5-year service so it can be re-certified by 20th December. Service / Maintenance works to be carried out between 13th - 17th Dec and include attendance at load testing and inspection on the 18th Dec, the load testing and inspection will be carried out by a third party arranged by NLB. Engineers need to be OEM and Class approved to work on the crane. Make & Model: Liebherr, RL-S 2650-30 Litronic Parts and scope of work listed within the Schedule of Requirements. Location will be Leith docks.…
Unverbindliche maschinelle Übersetzung. Die offizielle Zusammenfassung bleibt maßgeblich.
Amtliche Zusammenfassung · English
The Buoy Crane on the NLV Pharos vessel is in need of its 5-year service so it can be re-certified by 20th December. Service / Maintenance works to be carried out between 13th - 17th Dec and include attendance at load testing and inspection on the 18th Dec, the load testing and inspection will be carried out by a third party arranged by NLB. Engineers need to be OEM and Class approved to work on the crane. Make & Model: Liebherr, RL-S 2650-30 Litronic Parts and scope of work listed within the Schedule of Requirements. Location will be Leith docks.…
Bekanntmachungsverlauf
Zeitlicher Ablauf des Vergabeverfahrens
Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.
Bisher wurde keine weitere zugehörige Bekanntmachung ermittelt.
-
Auftragsbekanntmachung Angezeigte Bekanntmachung
· Find a Tender ocds-h6vhtk-079250
Amtliche Bekanntmachung öffnen ↗
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.
Quelle und Verlässlichkeit
Find a Tender · ocds-h6vhtk-079250. Geprüft am 01.11.2026, 16:13.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.