Oficjalne podsumowanie · English
Co jest przedmiotem zamówienia?
The Buoy Crane on the NLV Pharos vessel is in need of its 5-year service so it can be re-certified by 20th December. Service / Maintenance works to be carried out between 13th - 17th Dec and include attendance at load testing and inspection on the 18th Dec, the load testing and inspection will be carried out by a third party arranged by NLB. Engineers need to be OEM and Class approved to work on the crane. Make & Model: Liebherr, RL-S 2650-30 Litronic Parts and scope of work listed within the Schedule of Requirements. Location will be Leith docks.…
Pomocnicze tłumaczenie maszynowe. Oficjalne podsumowanie pozostaje rozstrzygające.
Oficjalne podsumowanie · English
The Buoy Crane on the NLV Pharos vessel is in need of its 5-year service so it can be re-certified by 20th December. Service / Maintenance works to be carried out between 13th - 17th Dec and include attendance at load testing and inspection on the 18th Dec, the load testing and inspection will be carried out by a third party arranged by NLB. Engineers need to be OEM and Class approved to work on the crane. Make & Model: Liebherr, RL-S 2650-30 Litronic Parts and scope of work listed within the Schedule of Requirements. Location will be Leith docks.…
Historia ogłoszeń
Oś czasu postępowania o udzielenie zamówienia
Śledź główne etapy i aktualizacje powiązane z tym postępowaniem o udzielenie zamówienia.
Nie znaleziono jeszcze żadnego innego powiązanego ogłoszenia.
-
Ogłoszenie o procedurze konkurencyjnej Przeglądane ogłoszenie
· Find a Tender ocds-h6vhtk-079250
Otwórz oficjalne ogłoszenie ↗
Dane uporządkowano dla łatwiejszego czytania. Zawsze rozstrzygają oficjalne ogłoszenie i dokumenty zamówienia.
Źródło i wiarygodność
Find a Tender · ocds-h6vhtk-079250. Sprawdzono 1 lis 2026, 16:13.
Dane uporządkowano dla łatwiejszego czytania. Zawsze rozstrzygają oficjalne ogłoszenie i dokumenty zamówienia.