Officiell sammanfattning · English
Vad upphandlas?
The Buoy Crane on the NLV Pharos vessel is in need of its 5-year service so it can be re-certified by 20th December. Service / Maintenance works to be carried out between 13th - 17th Dec and include attendance at load testing and inspection on the 18th Dec, the load testing and inspection will be carried out by a third party arranged by NLB. Engineers need to be OEM and Class approved to work on the crane. Make & Model: Liebherr, RL-S 2650-30 Litronic Parts and scope of work listed within the Schedule of Requirements. Location will be Leith docks.…
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
The Buoy Crane on the NLV Pharos vessel is in need of its 5-year service so it can be re-certified by 20th December. Service / Maintenance works to be carried out between 13th - 17th Dec and include attendance at load testing and inspection on the 18th Dec, the load testing and inspection will be carried out by a third party arranged by NLB. Engineers need to be OEM and Class approved to work on the crane. Make & Model: Liebherr, RL-S 2650-30 Litronic Parts and scope of work listed within the Schedule of Requirements. Location will be Leith docks.…
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Inget annat relaterat meddelande har ännu identifierats.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
Find a Tender · ocds-h6vhtk-079250. Kontrollerad 1 nov. 2026 16:13.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.