Résumé officiel · English
Quel est l’objet du marché ?
The Buoy Crane on the NLV Pharos vessel is in need of its 5-year service so it can be re-certified by 20th December. Service / Maintenance works to be carried out between 13th - 17th Dec and include attendance at load testing and inspection on the 18th Dec, the load testing and inspection will be carried out by a third party arranged by NLB. Engineers need to be OEM and Class approved to work on the crane. Make & Model: Liebherr, RL-S 2650-30 Litronic Parts and scope of work listed within the Schedule of Requirements. Location will be Leith docks.…
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
The Buoy Crane on the NLV Pharos vessel is in need of its 5-year service so it can be re-certified by 20th December. Service / Maintenance works to be carried out between 13th - 17th Dec and include attendance at load testing and inspection on the 18th Dec, the load testing and inspection will be carried out by a third party arranged by NLB. Engineers need to be OEM and Class approved to work on the crane. Make & Model: Liebherr, RL-S 2650-30 Litronic Parts and scope of work listed within the Schedule of Requirements. Location will be Leith docks.…
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
-
Avis de mise en concurrence Avis consulté
· Find a Tender ocds-h6vhtk-079250
Ouvrir l’avis officiel ↗
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
Find a Tender · ocds-h6vhtk-079250. Vérifié le 1 nov. 2026 à 16:13.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.