Službeni sažetak · English
Što se nabavlja?
The Buoy Crane on the NLV Pharos vessel is in need of its 5-year service so it can be re-certified by 20th December. Service / Maintenance works to be carried out between 13th - 17th Dec and include attendance at load testing and inspection on the 18th Dec, the load testing and inspection will be carried out by a third party arranged by NLB. Engineers need to be OEM and Class approved to work on the crane. Make & Model: Liebherr, RL-S 2650-30 Litronic Parts and scope of work listed within the Schedule of Requirements. Location will be Leith docks.…
Strojni prijevod za lakše razumijevanje. Službeni sažetak ostaje mjerodavan.
Službeni sažetak · English
The Buoy Crane on the NLV Pharos vessel is in need of its 5-year service so it can be re-certified by 20th December. Service / Maintenance works to be carried out between 13th - 17th Dec and include attendance at load testing and inspection on the 18th Dec, the load testing and inspection will be carried out by a third party arranged by NLB. Engineers need to be OEM and Class approved to work on the crane. Make & Model: Liebherr, RL-S 2650-30 Litronic Parts and scope of work listed within the Schedule of Requirements. Location will be Leith docks.…
Povijest obavijesti
Vremenski slijed postupka nabave
Pratite glavne faze i izmjene povezane s ovim postupkom nabave.
Još nije pronađena nijedna druga povezana obavijest.
-
Obavijest o nadmetanju Obavijest koju pregledavate
· Find a Tender ocds-h6vhtk-079250
Otvorite službenu obavijest ↗
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.
Izvor i pouzdanost
Find a Tender · ocds-h6vhtk-079250. Provjereno 1. stu 2026. 16:13.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.