The proposed works at Youghal include removing all the silica sand and transferring it to an area onsite then remove the terram and dispose of. The next part is to ruffle the existing drainage stone and the lay 4 inches of drainage stone and put down new teram and lay 4 inches of coarse rabbit sand on top of the teram and then relay the silica sand previously removed. This work would have to be done in a two-week period as we intend on closing the track during the works. We would also require the cleaning of the drain on the infield of the track and insert a drain in the infield to allow clear drainage.
Unverbindliche maschinelle Übersetzung. Die offizielle Zusammenfassung bleibt maßgeblich.
Amtliche Zusammenfassung · English
The proposed works at Youghal include removing all the silica sand and transferring it to an area onsite then remove the terram and dispose of. The next part is to ruffle the existing drainage stone and the lay 4 inches of drainage stone and put down new teram and lay 4 inches of coarse rabbit sand on top of the teram and then relay the silica sand previously removed. This work would have to be done in a two-week period as we intend on closing the track during the works. We would also require the cleaning of the drain on the infield of the track and insert a drain in the infield to allow clear drainage.
Bekanntmachungsverlauf
Zeitlicher Ablauf des Vergabeverfahrens
Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.
Bisher wurde keine weitere zugehörige Bekanntmachung ermittelt.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.
Quelle und Verlässlichkeit
TED · 432644-2026. Geprüft am 23.08.2026, 06:05.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.