The proposed works at Youghal include removing all the silica sand and transferring it to an area onsite then remove the terram and dispose of. The next part is to ruffle the existing drainage stone and the lay 4 inches of drainage stone and put down new teram and lay 4 inches of coarse rabbit sand on top of the teram and then relay the silica sand previously removed. This work would have to be done in a two-week period as we intend on closing the track during the works. We would also require the cleaning of the drain on the infield of the track and insert a drain in the infield to allow clear drainage.
Traducere automată orientativă. Rezumatul oficial rămâne referința.
Rezumat oficial · English
The proposed works at Youghal include removing all the silica sand and transferring it to an area onsite then remove the terram and dispose of. The next part is to ruffle the existing drainage stone and the lay 4 inches of drainage stone and put down new teram and lay 4 inches of coarse rabbit sand on top of the teram and then relay the silica sand previously removed. This work would have to be done in a two-week period as we intend on closing the track during the works. We would also require the cleaning of the drain on the infield of the track and insert a drain in the infield to allow clear drainage.
Istoricul anunțului
Cronologia procedurii de achiziție
Urmăriți principalele etape și actualizări legate de această procedură de achiziție.
Nu a fost identificat încă niciun alt anunț asociat.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.
Sursă și fiabilitate
TED · 432644-2026. Verificat la 23 aug. 2026, 06:05.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.