The proposed works at Youghal include removing all the silica sand and transferring it to an area onsite then remove the terram and dispose of. The next part is to ruffle the existing drainage stone and the lay 4 inches of drainage stone and put down new teram and lay 4 inches of coarse rabbit sand on top of the teram and then relay the silica sand previously removed. This work would have to be done in a two-week period as we intend on closing the track during the works. We would also require the cleaning of the drain on the infield of the track and insert a drain in the infield to allow clear drainage.
Informativni strojni prevod. Uradni povzetek ostaja merodajen.
Uradni povzetek · English
The proposed works at Youghal include removing all the silica sand and transferring it to an area onsite then remove the terram and dispose of. The next part is to ruffle the existing drainage stone and the lay 4 inches of drainage stone and put down new teram and lay 4 inches of coarse rabbit sand on top of the teram and then relay the silica sand previously removed. This work would have to be done in a two-week period as we intend on closing the track during the works. We would also require the cleaning of the drain on the infield of the track and insert a drain in the infield to allow clear drainage.
Zgodovina obvestil
Časovnica postopka javnega naročanja
Spremljajte glavne faze in posodobitve, povezane s tem postopkom javnega naročanja.
Za zdaj ni bilo najdeno nobeno drugo povezano obvestilo.
Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.
Vir in zanesljivost
TED · 432644-2026. Preverjeno 23. avg. 2026 06:05.
Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.