The proposed works at Youghal include removing all the silica sand and transferring it to an area onsite then remove the terram and dispose of. The next part is to ruffle the existing drainage stone and the lay 4 inches of drainage stone and put down new teram and lay 4 inches of coarse rabbit sand on top of the teram and then relay the silica sand previously removed. This work would have to be done in a two-week period as we intend on closing the track during the works. We would also require the cleaning of the drain on the infield of the track and insert a drain in the infield to allow clear drainage.
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
The proposed works at Youghal include removing all the silica sand and transferring it to an area onsite then remove the terram and dispose of. The next part is to ruffle the existing drainage stone and the lay 4 inches of drainage stone and put down new teram and lay 4 inches of coarse rabbit sand on top of the teram and then relay the silica sand previously removed. This work would have to be done in a two-week period as we intend on closing the track during the works. We would also require the cleaning of the drain on the infield of the track and insert a drain in the infield to allow clear drainage.
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 432644-2026. Verificato il 23 ago 2026, 06:05.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.