The proposed works at Youghal include removing all the silica sand and transferring it to an area onsite then remove the terram and dispose of. The next part is to ruffle the existing drainage stone and the lay 4 inches of drainage stone and put down new teram and lay 4 inches of coarse rabbit sand on top of the teram and then relay the silica sand previously removed. This work would have to be done in a two-week period as we intend on closing the track during the works. We would also require the cleaning of the drain on the infield of the track and insert a drain in the infield to allow clear drainage.
Orientační strojový překlad. Rozhodující zůstává oficiální shrnutí.
Oficiální shrnutí · English
The proposed works at Youghal include removing all the silica sand and transferring it to an area onsite then remove the terram and dispose of. The next part is to ruffle the existing drainage stone and the lay 4 inches of drainage stone and put down new teram and lay 4 inches of coarse rabbit sand on top of the teram and then relay the silica sand previously removed. This work would have to be done in a two-week period as we intend on closing the track during the works. We would also require the cleaning of the drain on the infield of the track and insert a drain in the infield to allow clear drainage.
Historie oznámení
Časová osa zadávacího řízení
Sledujte hlavní fáze a aktualizace spojené s tímto zadávacím řízením.
Dosud nebylo nalezeno žádné další související oznámení.
-
Oznámení o zahájení zadávacího řízení Prohlížené oznámení
· TED 432644-2026
Otevřít oficiální oznámení ↗
Data jsou upravena pro snazší čtení. Oficiální oznámení a zadávací dokumentace mají vždy přednost.
Zdroj a spolehlivost
TED · 432644-2026. Ověřeno 23. 8. 2026 6:05.
Data jsou upravena pro snazší čtení. Oficiální oznámení a zadávací dokumentace mají vždy přednost.