Official summary
What is being procured?
Iarnród Éireann intends to replace the existing diesel fuel distribution pipework associated with the train fuelling system in Connolly Station. Approximately 200 metres of the pipeline connection from the fuel farm to the arches underneath have recently been replaced with a double-walled pipe with leak detection. The purpose of this project is to replace the remaining pipeline network, approximately 950 metres with a modern double walled fuel distribution system incorporating continuous leak detection, shut off valves, improved accessibility for inspection and maintenance, and enhanced environmental protection in accordance with current industry standards and best practice.
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 737748-2026. Checked on Oct 29, 2026, 12:05 PM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.