Iarnród Éireann intends to replace the existing diesel fuel distribution pipework associated with the train fuelling system in Connolly Station. Approximately 200 metres of the pipeline connection from the fuel farm to the arches underneath have recently been replaced with a double-walled pipe with leak detection. The purpose of this project is to replace the remaining pipeline network, approximately 950 metres with a modern double walled fuel distribution system incorporating continuous leak detection, shut off valves, improved accessibility for inspection and maintenance, and enhanced environmental protection in accordance with current industry standards and best practice.
Informatīvs mašīntulkojums. Oficiālais kopsavilkums joprojām ir noteicošais.
Oficiālais kopsavilkums · English
Iarnród Éireann intends to replace the existing diesel fuel distribution pipework associated with the train fuelling system in Connolly Station. Approximately 200 metres of the pipeline connection from the fuel farm to the arches underneath have recently been replaced with a double-walled pipe with leak detection. The purpose of this project is to replace the remaining pipeline network, approximately 950 metres with a modern double walled fuel distribution system incorporating continuous leak detection, shut off valves, improved accessibility for inspection and maintenance, and enhanced environmental protection in accordance with current industry standards and best practice.
Paziņojuma vēsture
Iepirkuma procedūras laika skala
Sekojiet galvenajiem posmiem un atjauninājumiem, kas saistīti ar šo iepirkuma procedūru.
Cits saistīts paziņojums vēl nav identificēts.
Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.
Avots un uzticamība
TED · 737748-2026. Pārbaudīts 2026. gada 29. okt. 12:05.
Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.