Iarnród Éireann intends to replace the existing diesel fuel distribution pipework associated with the train fuelling system in Connolly Station. Approximately 200 metres of the pipeline connection from the fuel farm to the arches underneath have recently been replaced with a double-walled pipe with leak detection. The purpose of this project is to replace the remaining pipeline network, approximately 950 metres with a modern double walled fuel distribution system incorporating continuous leak detection, shut off valves, improved accessibility for inspection and maintenance, and enhanced environmental protection in accordance with current industry standards and best practice.
Abistav masintõlge. Ametlik kokkuvõte jääb määravaks.
Ametlik kokkuvõte · English
Iarnród Éireann intends to replace the existing diesel fuel distribution pipework associated with the train fuelling system in Connolly Station. Approximately 200 metres of the pipeline connection from the fuel farm to the arches underneath have recently been replaced with a double-walled pipe with leak detection. The purpose of this project is to replace the remaining pipeline network, approximately 950 metres with a modern double walled fuel distribution system incorporating continuous leak detection, shut off valves, improved accessibility for inspection and maintenance, and enhanced environmental protection in accordance with current industry standards and best practice.
Teate ajalugu
Hankemenetluse ajajoon
Jälgige selle hankemenetlusega seotud põhietappe ja uuendusi.
Ühtegi muud seotud teadet ei ole veel tuvastatud.
Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.
Allikas ja usaldusväärsus
TED · 737748-2026. Kontrollitud 29. okt 2026 12:05.