2 GW HVDC Offshore Platform and Converter System (2 GW HVDC System) for the NorthSeaConnector 1 Project (Yard Scope)

50Hertz Offshore GmbH · Germany

View notices under this name
Official summary · Deutsch

The overall scope of supply and services of the project shall be for the turnkey delivery of the 2 GW offshore converter system comprises to engineer, procure, construct/manufacture, transport to offshore, install, commission onshore/offshore and test as an EPCI Contractor the offshore converter platform in the area N-11.1 as well as an onshore converter at a 50Hertz substation. The scope consists of the respective complete substructure and topside of…

What is being procured?
Deadline Not announced
Estimated value1 EUR
PublishedSep 17, 2026
Open official notice ↗

Official summary · Deutsch

What is being procured?

The overall scope of supply and services of the project shall be for the turnkey delivery of the 2 GW offshore converter system comprises to engineer, procure, construct/manufacture, transport to offshore, install, commission onshore/offshore and test as an EPCI Contractor the offshore converter platform in the area N-11.1 as well as an onshore converter at a 50Hertz substation. The scope consists of the respective complete substructure and topside of the offshore platform including transport & installation and the civil works of the onshore substation including its hvdc systems, both with the corresponding electrical equipment, non-electrical equipment as well as other reasonably required scope and services for a fully functional 2 GW converter system ready for operation and connection to

Notice history

Procurement timeline

Follow the main stages and updates linked to this procurement procedure.

No other related notice has been identified yet.

  1. Result notice Current notice

    · TED 641086-2026

    Open official notice ↗

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Source and reliability

TED · 641086-2026. Checked on Sep 17, 2026, 11:05 AM.

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Report an error by email