Officielt resumé · Deutsch
Hvad indkøbes?
The overall scope of supply and services of the project shall be for the turnkey delivery of the 2 GW offshore converter system comprises to engineer, procure, construct/manufacture, transport to offshore, install, commission onshore/offshore and test as an EPCI Contractor the offshore converter platform in the area N-11.1 as well as an onshore converter at a 50Hertz substation. The scope consists of the respective complete substructure and topside of the offshore platform including transport & installation and the civil works of the onshore substation including its hvdc systems, both with the corresponding electrical equipment, non-electrical equipment as well as other reasonably required scope and services for a fully functional 2 GW converter system ready for operation and connection to
Vejledende maskinoversættelse. Det officielle resumé er fortsat gældende.
Officielt resumé · Deutsch
The overall scope of supply and services of the project shall be for the turnkey delivery of the 2 GW offshore converter system comprises to engineer, procure, construct/manufacture, transport to offshore, install, commission onshore/offshore and test as an EPCI Contractor the offshore converter platform in the area N-11.1 as well as an onshore converter at a 50Hertz substation. The scope consists of the respective complete substructure and topside of the offshore platform including transport & installation and the civil works of the onshore substation including its hvdc systems, both with the corresponding electrical equipment, non-electrical equipment as well as other reasonably required scope and services for a fully functional 2 GW converter system ready for operation and connection to
Gratis
Få de næste udbud i denne branche
Modtag en ugentlig e-mail med nye bekendtgørelser, der matcher dine kriterier. Tjek eller tilpas kriterierne, før du aktiverer din gratis besked.
Meddelelseshistorik
Udbudsforløb
Følg de vigtigste faser og opdateringer i dette udbud.
Der er endnu ikke fundet en anden relateret meddelelse.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.
Kilde og pålidelighed
TED · 641086-2026. Kontrolleret 17. sep. 2026 11.05.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.