Attribué TED · Source · Langue: Deutsch

Allemagne · Travaux de construction

Titre officiel · Deutsch

2 GW HVDC Offshore Platform and Converter System (2 GW HVDC System) for the NorthSeaConnector 1 Project (Yard Scope)

50Hertz Offshore GmbH · Allemagne

Voir les avis sous ce nom
Échéance Non communiqué
Valeur estimée1 EUR
Publié17 sept. 2026
Ouvrir l’avis officiel ↗

Résumé officiel · Deutsch

Quel est l’objet du marché ?

The overall scope of supply and services of the project shall be for the turnkey delivery of the 2 GW offshore converter system comprises to engineer, procure, construct/manufacture, transport to offshore, install, commission onshore/offshore and test as an EPCI Contractor the offshore converter platform in the area N-11.1 as well as an onshore converter at a 50Hertz substation. The scope consists of the respective complete substructure and topside of the offshore platform including transport & installation and the civil works of the onshore substation including its hvdc systems, both with the corresponding electrical equipment, non-electrical equipment as well as other reasonably required scope and services for a fully functional 2 GW converter system ready for operation and connection to

Historique de l’avis

Chronologie de la procédure

Suivez les principales étapes et mises à jour liées à cette procédure de passation.

Aucun autre avis lié n’a encore été identifié.

  1. Avis d’attribution Avis actuel

    · TED 641086-2026

    Ouvrir l’avis officiel ↗

Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.

Source et fiabilité

TED · 641086-2026. Vérifié le 17 sept. 2026 à 11:05.

Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.

Signaler une erreur par e-mail