Official summary · Nederlands
What is being procured?
The Dutch government has drawn up a road map for the development of offshore wind farms. The current goal for total capacity of offshore wind energy is 23 GW. Wind Farm Zone 6/7 is expected to be included in a next iteration of the offshore wind energy road map. In this context, the Netherlands Enterprise Agency has been tasked with providing site data for future wind farms in the Wind Farm Zones and commissions a Benthic Survey. The overall objective of the benthic survey is to collect factual benthic data to test the findings of a desktop study on reef detection in the DDW WFZ (results expected in July, 2026), and to establish a baseline measurement of the benthic environment in the area. The Tendering Authority has estimated the total contract value at EUR 700,000 (excl. VAT).
Machine translation for guidance. The official summary remains authoritative.
Official summary · Nederlands
The Dutch government has drawn up a road map for the development of offshore wind farms. The current goal for total capacity of offshore wind energy is 23 GW. Wind Farm Zone 6/7 is expected to be included in a next iteration of the offshore wind energy road map. In this context, the Netherlands Enterprise Agency has been tasked with providing site data for future wind farms in the Wind Farm Zones and commissions a Benthic Survey. The overall objective of the benthic survey is to collect factual benthic data to test the findings of a desktop study on reef detection in the DDW WFZ (results expected in July, 2026), and to establish a baseline measurement of the benthic environment in the area. The Tendering Authority has estimated the total contract value at EUR 700,000 (excl. VAT).
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 556875-2026. Checked on Aug 24, 2026, 4:05 PM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.