Rezumat oficial · Nederlands
Ce se achiziționează?
The Dutch government has drawn up a road map for the development of offshore wind farms. The current goal for total capacity of offshore wind energy is 23 GW. Wind Farm Zone 6/7 is expected to be included in a next iteration of the offshore wind energy road map. In this context, the Netherlands Enterprise Agency has been tasked with providing site data for future wind farms in the Wind Farm Zones and commissions a Benthic Survey. The overall objective of the benthic survey is to collect factual benthic data to test the findings of a desktop study on reef detection in the DDW WFZ (results expected in July, 2026), and to establish a baseline measurement of the benthic environment in the area. The Tendering Authority has estimated the total contract value at EUR 700,000 (excl. VAT).
Sursă și fiabilitate
Sursă: anunțul oficial TED 556875-2026, ultima verificare: 21 aug. 2026, 20:08. Publicarea originală rămâne determinantă.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.