Officiële samenvatting
Wat wordt ingekocht?
The Dutch government has drawn up a road map for the development of offshore wind farms. The current goal for total capacity of offshore wind energy is 23 GW. Wind Farm Zone 6/7 is expected to be included in a next iteration of the offshore wind energy road map. In this context, the Netherlands Enterprise Agency has been tasked with providing site data for future wind farms in the Wind Farm Zones and commissions a Benthic Survey. The overall objective of the benthic survey is to collect factual benthic data to test the findings of a desktop study on reef detection in the DDW WFZ (results expected in July, 2026), and to establish a baseline measurement of the benthic environment in the area. The Tendering Authority has estimated the total contract value at EUR 700,000 (excl. VAT).
Historie van de aankondiging
Tijdlijn van de aanbestedingsprocedure
Volg de belangrijkste fasen en updates van deze aanbestedingsprocedure.
De gegevens zijn voor een betere leesbaarheid geordend. De officiële aankondiging en aanbestedingsstukken zijn altijd doorslaggevend.
Bron en betrouwbaarheid
TED · 556875-2026. Gecontroleerd op 24 aug. 2026 16:05.
De gegevens zijn voor een betere leesbaarheid geordend. De officiële aankondiging en aanbestedingsstukken zijn altijd doorslaggevend.