Official summary
What is being procured?
The Contractor undertakes to design and perform a full charging infrastructure system com-patible with the battery-powered rolling stock described in Contract appendix 1, Requirements Specification. The Contract includes a complete power supply infrastructure and overhead contact line sys-tem, to be able to perform dynamic and static charging for battery trains: Hårlev Station • Overhead contact line system covering the three main tracks at the station • 50/25KV transformer solution to ensure power to the overhead contact line system • Detailed design • 400V power to train maintenance systems and heating and cleaning • Safety and interoperability approval • All necessary cable works on the station including cable trays • Immunization of the station signaling systems • Low voltage: Replacem
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 548575-2026. Checked on Aug 24, 2026, 3:05 PM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.